Golf:Washed, waxed and buffed it. Added a qt. of oil and checked to make sure all zipties are secureJetta: Fixed the rear wheel cyl., replaced an overly due axle. Fixed my starter
GTI: Test fitted the motor, stripped the motor down. Had my fabricator redo the combustion bowls, installed the Spec stage 3 kit, Sand blasted the enginebay, installed the new tie rods, balljoints and new rack, bead blasted my 11" G60 calipers in prep for caliper paint, sand blasted my MK4 rear calipers, re routed my guages, did some wire hiding magic
, Disassembled my turbo in prep for ceramic coating and some polishing
VR6: on engine stand: stripped, hot tanked, reamed....basicly rebuilding from the ground up, bead blasted the enitire rack in prep for powdercoat, labeled VR6 harness, stripped and cleaned rear beam. This will be my winter project soon as i find a MK1 to drop it in
Disclaimer: I forgot a few things as its late and im pooped
Tomorrow is body work day. hint butter smooth enginebay on the GTI